Bridging a Curtain Wall Expansion Joint With LED Strip
- 2026-11-23 16:40
- /
- Alan
Curtain walls move for wind, temperature and settlement. A strip bonded across an expansion joint becomes part of the structure, which it is not designed to be.
A tower facade had a continuous LED line running across two expansion joints. Within a year the strip had lifted at both joints and one section had failed where the profile had separated.
How much movement
Curtain wall expansion joints are typically designed for 10–25 mm of movement, depending on the system and the panel size. That is an order of magnitude more than the thermal expansion of the aluminum profile itself.
A strip bonded across the joint sees that movement as shear. The adhesive fails first, then the FPC cracks at the point of maximum strain.
Details that work
- Break the run at the joint. Two independent sections, each terminated before the joint, with a trim cover hiding the gap.
- Use a movement-tolerant connector. A short flexible jumper between two fixed sections allows movement without straining the strip.
- Keep the profile off the moving panel. Fix the profile to one side only; do not span the joint with a continuous extrusion.
- Allow a shadow gap. A deliberate dark gap reads as a design line and hides the movement.
What not to do
Do not bridge with a longer piece of strip "so it looks continuous". It will look continuous until the first hot afternoon. Do not fill the joint with sealant and run the strip over it; the sealant takes the movement and the strip takes the consequence.
Do not rely on a flexible diffuser to hide a rigid strip. The diffuser will deform; the FPC will crack.
Sealant is not a structural bridge either. A bead of silicone across the joint will tear within a few cycles and then hold water against the strip. If the joint must be weather-sealed, use a proper movement gasket behind the trim, not sealant over the lighting line.
Coordination with the facade contractor
Ask for the joint movement calculation and the location of every joint before setting out the run. On the tower job the lighting drawings showed one joint; the facade had three.
Set out the strip sections so joints fall on the facade joints, not between them. That requires the lighting layout to be coordinated with the panel module, which is a design-stage task, not a site fix. If the facade is already built, survey the joints first and adjust the section lengths rather than forcing a continuous line. That is quicker than arguing with the facade contractor after the strip has lifted.
Commissioning and inspection
Walk the facade line after the first significant temperature swing and look for lifted strip or a gap at the joint. Photograph the joint detail at handover so future maintenance knows it is designed to move.
Our facade profiles include details for sectioned runs, and the connector range covers flexible jumpers for movement.