Cutting and Rejoining a 30-Metre COB Run: Where the Voltage Goes
- 2026-11-23 16:37
- /
- Alan
A 30 m COB run is rarely delivered as one piece. It arrives as reels, and someone has to join them. The joint is the weakest electrical point in the run and the one most likely to be hidden.
On a 30 m cove we found four reels joined end to end, each joint covered with heat-shrink and tucked into the channel. Two joints were fine. One read 0.15 ohm and one read 0.35 ohm, which at 8.75 A cost about 3V between them.
Cut only at the marked points
COB strip has cut marks at regular intervals, typically every 25–50 mm depending on voltage and pitch. Cutting elsewhere severs the bus and leaves a section that cannot be powered. On a 24V COB the interval is usually short, which is convenient, but it also means there are many possible cut points and installers sometimes cut at the nearest one to the wall rather than the correct one.
Cut squarely across the pads with a sharp blade on a flat surface. A ragged cut bridges adjacent pads or leaves a trace hanging.
Soldering versus connectors
- Solder gives the lowest and most stable resistance, typically a few milliohms, if the pads are clean and the iron is hot enough. It is the better choice inside a sealed cove where the joint will not be serviced.
- Solderless connectors are faster and removable, but contact resistance varies and can rise with thermal cycling. Use them where access is possible and current per joint is modest.
- Insulation displacement types are convenient on site but are the most sensitive to strip thickness and pad cleanliness.
Measure every joint
With the run lit, probe before and after each joint. Under 0.1V is good, 0.3V is a candidate for rework, 0.5V or more is a defect. On a 30 m run with four joints, the losses add up faster than most people expect.
| Joint condition | Drop at 8.75 A | Action |
|---|---|---|
| Good solder | 0.02–0.05 V | None |
| Average connector | 0.1–0.2 V | Monitor |
| Poor contact | 0.3–0.6 V | Rework |
Stagger the joints
If several reels must be joined in one channel, stagger the joints by at least 100 mm so the heat is not concentrated in one place and the channel does not develop a local hot band. Mechanically it also avoids a bulge that lifts the strip off the aluminum.
Alternative: feed each segment
On a 30 m run, the cleanest approach is often not to join at all in the electrical sense. Feed each 7.5 m segment from a parallel feeder, so each joint carries only its segment's current. The strip still looks continuous; the electrical path is short.
That is the same principle as power injection, applied at the reel boundaries rather than at arbitrary intervals. It costs a little more cable and removes the joint-loss problem entirely.
Our COB ranges list cut intervals and pad layout, and the connector options state current ratings per joint.