Power Injection Spacing: How We Choose Tap Intervals on Long 24V Runs
- 2026-11-23 16:26
- /
- Alan
Injection spacing is a voltage-drop question, not a round number. The interval that works on a 7 W/m COB strip will visibly fail on a 14.4 W/m SMD strip, and the cable you run between taps changes the answer again.
On a 42 m high-end retail perimeter we injected at 6 m intervals. On a 30 m office cove with the same 24V family we used 10 m intervals. Both looked uniform. The difference was wattage and board width, not luck.
Start from the allowable drop
Set a target before choosing spacing. For architectural cove work we aim to keep the far end of any segment within 3% of nominal, which on 24V is 0.7V. Above 5% the gradient becomes visible on white; above 10% it reads as a fault.
For a segment of length L metres, fed at one end, carrying w W/m at voltage V:
- Current per metre: i = w / V
- Segment current at the feed: I = i × L
- Distributed drop across the strip: Vdrop ≈ I × Rstrip / 2, where Rstrip is the total trace resistance over L
Solve for L given your strip's measured trace resistance and your target drop. That gives the maximum distance between a feed point and the end of its zone. Injection spacing is twice that, because a tap feeds both directions.
Example from a real run
A 24V COB strip at 7 W/m, 0.29 A/m. Trace resistance measured at about 0.02 Ω/m per conductor pair. With a 0.7V budget and half the segment on each side of a tap, each side can be about 8.5 m. We set taps at 15 m and kept the last tail under 8 m. Measured far-end drop after commissioning: 0.5V.
Change the strip to 14.4 W/m SMD and the current doubles to 0.6 A/m. The same 0.7V budget brings the usable half-length down to roughly 4 m. That is why 5 m injection spacing is common on high-output SMD runs and 10–12 m is common on 7 W/m COB.
The feeder between taps matters as much as the taps
Injection is only useful if the parallel feeder arrives at each tap with voltage still close to 24V. A 2×0.75 mm² cable run 30 m along the cove, carrying the accumulated current for downstream taps, will lose more voltage than the strip it is supposed to be helping. We size the injection feeder for the total downstream current and keep its drop under 0.3V, which usually means 1.5 mm² or 2.5 mm² on commercial lengths.
Every tap should be fused or breakered independently. A short in one tap should not take down the feeder for the whole run, and a 10A fuse at the driver does not protect a 22AWG tap lead.
Where to physically tap
- Preferred: at a reel joint, where the pads are already exposed and the strip is supported.
- Acceptable: at a cut point, using a solderless connector rated for the strip width.
- Avoid: mid-reel soldering on a live cove, especially on 5mm COB where the pads are small and heat-sensitive.
- Always: label the tap with its circuit and fuse rating inside the void. The next technician will not have your drawing.
What can go wrong with injection
Two feeds at different voltages into the same strip will circulate current between them. If you inject from a separate driver, bond the 0V rails and check both outputs under load before connecting the second feed. If the two drivers regulate at slightly different voltages, the higher one carries the difference and runs hotter.
Polarity errors at a tap are common and destructive on addressable strip. On constant-voltage COB the strip simply will not light beyond the tap, which is easier to diagnose but still a rework visit.
If the cove is already closed, injection is the only practical fix short of reopening the ceiling. Plan it before the drywall goes up. Our COB families and strip connectors cover the tap hardware we use most.